Resources/ 5 min read

How Long Does a Corporate Video Take to Produce?

A realistic guide to corporate video production timelines, from brief to final delivery. What takes time, what can be expedited, and what to plan for.

The Typical Timeline

Most corporate video projects run 3 to 5 weeks from brief to final delivery, assuming the brief is clear, approvals are timely, and there are no major revisions. Here's how that time is typically distributed:

  • Week 1: Brief, discovery, scripting, and pre-production planning.
  • Week 2: Shoot day (or days), the actual production.
  • Week 3: First edit delivered for review.
  • Week 4: Revisions incorporated, final approvals.
  • Weeks 4 to 5: Final delivery files prepared and sent.

What Can Slow a Project Down

Most delays in corporate video production come from the client side, not the production company. Common causes include:

  • Approval bottlenecks, with too many stakeholders in the sign-off chain.
  • Script feedback that fundamentally changes the brief.
  • Scheduling conflicts with on-camera talent or locations.
  • Delayed delivery of assets such as logos, brand guidelines, and existing footage.
  • Revision requests that go beyond the agreed scope.

Rush Timelines, Is It Possible?

Yes, but it costs more and requires a very clear brief upfront. A simple corporate video can be turned around in 5 to 7 business days if the brief is locked, the shoot is straightforward, and approval is fast. Rush fees typically apply for expedited post-production.

Animation Takes Longer

Animated videos typically take longer than live-action because each element must be designed and built from scratch. A typical 90-second 2D explainer can take 4 to 6 weeks. The stages of scriptwriting, storyboard, style frames, animation, and sound design must be completed sequentially.

Multi-Video Projects

Training series, onboarding programs, and content campaigns that require multiple videos are best treated as ongoing productions. Batch shooting, where footage for multiple videos is captured in a single shoot, is cost-effective and can compress the overall timeline significantly.

Planning Tip: Work Backwards

The most effective way to manage your video timeline is to start with your hard delivery deadline and work backwards. If you need the video ready for a conference on October 15, aim to have the brief finalised by September 1. This gives you eight weeks of buffer, enough to absorb the typical delays.

Ready to Start Your Video Project?

Get a fixed-price quote from Boost Video within 24 hours. No obligation, no vague estimates.